The enterprise project
structure (EPS) organizes and summarizes all projects within the enterprise
hierarchically for top-down budgeting, resource and cost analysis, and global
control of data. Technical Data used in the field explained in primavera p6 training in
Islamabad. An enterprise structure enables you to manage multiple
projects from the highest levels of the organization to the individuals that
perform specific project tasks. You can also use the EPS to define project
properties, including dates, budgets, codes, resources, and project defaults.
Use the Project Details
tabs in the bottom portion of the Projects window to define project properties
and defaults used throughout a project. You can also assign some general
properties to the EPS nodes in your hierarchy. Some more details of primavera p6 training in
Islamabad are as under.
Display Details by
clicking the Display Options bar and selecting Show on Bottom, Project Details,
so that the checkmark appears. You can assign a resource distribution curve to
any resource or role assignment on activities with a duration type of Fixed
Duration and Units/Time or Fixed Duration & Units. Assign the appropriate
curve to a resource or role assignment by selecting a curve in the Curve column
in the Resource Assignments window. You can also assign a resource curve in the
Resources tab in the Activity Details.
Open each tab to view
and edit the selected project‘s information. The details include schedule
information, project codes, summarization information, default settings such as
duration type for new activities, and activity numbering increments. TSK